Solving Oilfield Problems Since 1967
Providing nationwide sales and installation of custom lining,
secondary containment systems, cattle guards, and other oilfield solutions.
Drop-In Liners >

ONE PIECE DROP-IN PLATING TANK LINERS

Benefits: Puts leaking tanks (metal or plastic) back in service quickly.  Prevents Corrosion Prolongs the Life of new and existing tanks.

Products Contained: Extremely corrosive and high temperature chemicals, acids and waste fluids.  Call us for material compatibility of your corrosive chemicals

Liner Materials: Quality materials in various thickness determined by project application.

Construction of Liner: Dielectric seaming creates full material tear strength and smooth bonding.

 
CALL US TODAY. WE'RE HERE FOR YOU.
 
Tommy Carter
(405) 481-8085
DROP-IN LINERS
 
Guarantee - your liner will fit and hold fluid. Not satisfied? We'll replace it for free.
 
Other Benefits of drop-in liners
  • Custom manufactured to any shape, size or configuration.
  • Can be put over Koreseal lined, lead lined  or coated tanks.
  • Can be used in steel, plastic, wood, concrete, fiberglass tanks, old and new.
  • Can hold a wide range of chemicals from pH1-pH14; and will withstand temperatures up to 200º F because they are made from a variety of available materials.
  • Quality quick fix that will extend the life of your existing tank.
  • Virtually maintenance free.
  • Perfect for the electroplater where an insulator is needed for steel tanks and helps prevent build up.
  • Used in almost all industries where corrosion and/or contamination is a problem.
Special Features:
Double or Hydrolytic Bottom
Double-Skirted Wall
Teflon Skirts
Weirs
Sumps
Inlets and Outlets
  • Quick Turnaround
  • Highest Quality
  • Easy Installation
  • No Special Tank Preparation
  • Minimal Downtime
  • Savings
We have years of experience installing premium liners to hold Chromic Acid.  By adding a skirt to the top 12" - 24" (the fluid/air interface) a liner can provide full life-expectancy.

Most liners are easily installed by your own personnel, we can also provide an installation supervisor or full/partial installation crew.

Research is ongoing because our goal is to have every liner last at least five years.  If you think you have a problem that can't be solved, contact us and we will find a solution.

Our professional installation crews consider your safety procedures a top priority. Our outstanding record testifies to our commitment to work safety. To learn more about the Unit Liner commitment to safety Click Here.